São Paulo Expo · Stand Builder
Booths at São Paulo Expo — Design, Build & Rental
Full-service stand/booth builder for São Paulo Expo: design, build, rental, AV & lighting, rigging coordination and on-site support.
What we do
- Booth design • build • rental
- Graphics, AV, lighting, furniture
- Install, daily checks & dismantle
Lead times
- Typical: 3–6 weeks
- Rigging & AV may extend
- First 3D from floor plan
Why São Paulo Expo
- Largest & most modern venue
- Deep AV inventory in SP
- Efficient logistics & docks
Rigging & Power at São Paulo Expo
- Rigging requests: submit with load specs, plan view and point locations (typ. 15–30 days in advance).
- Ceiling points & loads: truss layout and total loads must comply with venue allowances.
- Electrical plan: power map (kW), distribution, sockets and safety devices by zone.
- LED walls & lighting: define weight, dimensions, and cable management; ground support when rigging isn’t approved.
- Safety & insurance: PPE, fire extinguishers, cable management and insurance certificates as required.
Move-in windows
- Dock scheduling and credentials
- Forklifts & handling on request
- Night shifts for tight builds
On-site coordination
- Vendor liaison & badges
- Power/internet orders
- Daily checks & cleaning
We orchestrate docks, paperwork and on-site services so your team focuses on meetings and demos.
Small (9–18 m²)
- Open corner + high header
- 1 demo, 1 storage, light lounge
- Fabric backlit or lightbox
Medium (24–54 m²)
- 2–3 demo islands + meeting room
- LED wall (ground or rigging)
- Reception + storage
Large (60–200+ m²)
- Axis portals + hanging cube
- Multiple rooms & lounges
- LED volumes & ceiling lighting
Design
- 3D concept & layout
- Brand storytelling
- Graphics & signage
Build & Rental
- Modular • Hybrid • Custom
- Furniture & lounges
- Install & dismantle
AV & Rigging
- LED walls, sound, lighting
- Rigging requests & loads
- Ceiling points or ground support
FAQ — São Paulo Expo
Do we need rigging approval?
Yes. Requests usually include loads, point locations and drawings, submitted ahead of time.
Ground support vs. ceiling rigging?
We recommend ground support when rigging isn’t viable or timelines are short; otherwise rigging improves visibility.
Can you supply LED and stage lighting?
Yes. We coordinate LED walls, sound and lighting with approved suppliers and the venue.
How early should we start?
Typical builds take 3–6 weeks. Large LED or complex rigging benefit from earlier submissions.
Request a Proposal
Send your floor plan or booth size. We’ll reply with a layout suggestion and an estimated budget.
Get a Booth Quote for São Paulo Expo
Send your floor plan on WhatsApp — get a free 3D layout suggestion.
Request via WhatsApp