Safety, standards and LGPD — compliance that reduces risk and speeds approvals
Human, clear and auditable processes — from briefing to dismantle. Safety, standards and data under control so your exhibit gets approved and delivered on time.
Essentials
- ART/CREA when required and full compliance with NR-18/NR-35.
- Checklists + photos of critical stages (when contracted), stored for 90 days.
- LGPD applied to clients, suppliers and crew registration.
- Modular reuse, waste segregation and MTR disposal when applicable.
- Transparent communication: scope, deadlines, responsibilities and risks agreed before execution.
1) Safety & Technical Standards
- ART/CREA for structural projects when required by venue/client.
- Compliance with NR-18 (site/assembly) and NR-35 (work at height).
- Trained crew, PPE and SOPs signed by the technical lead.
- Spec sheet and load chart whenever requested.
2) Legal & Contract Compliance
- Documented scope and responsibilities (materials, deadlines, limits).
- Third-party management with periodic labor compliance checks.
- Venue rules observed (setbacks, height, electrical, fire safety).
- Upfront communication of project risks and constraints.
3) Data Protection (LGPD)
- Data minimization with clear purpose and proper legal basis.
- Internal access controls and NDA clauses.
- No sharing with third parties without legal need or consent.
- Data subject channel: Privacy.
Data Protection Officer (DPO): compliance@mobicomestruturas.com.br
4) Sustainability & ESG
- Modular reuse and waste reduction.
- Responsible disposal per local regulations (MTR when applicable).
- Preference for certified suppliers.
- FSC-source MDF and water-based paints whenever feasible.
Lower risk
Reduces legal and labor exposure with clear documentation and accountability.
Faster approvals
Projects aligned with venue, shopping mall or public-agency rules.
Transparency
Scope, deadlines and change control — agreed before execution.
Local notes — Brasília
- Move-in windows: we follow dock schedules to avoid queues and fines.
- Height & setbacks: floor plans validated in advance to prevent rejections.
- Power & fire: dedicated panel, labeled breakers and extinguisher where required.
Need to confirm feasibility for your date? Talk to our technical team.
Technical lead & documents
- ART/CREA issued when required by venue or project complexity.
- Signed SOPs, PPE list and risk assessment.
- Spec sheet, load chart and photo reports (when contracted).
Quick FAQ
Answer: When is ART/CREA required?
Whenever a structural design is required by the venue, by the client or due to stand complexity (suspended loads, mezzanines, special structures). If unsure, we evaluate during briefing.
Answer: Do you provide assembly reports?
Yes. We can record checklists and photos of critical steps (when contracted) and share them for your internal audits.
Answer: How does LGPD apply to the service?
We collect only what is necessary to perform the contract (contacts, tax and operational data). Restricted access is enforced and we do not share data with third parties without legal basis or consent. For data-subject requests, visit Privacy or email compliance@mobicomestruturas.com.br.
Next step
Send the venue and dates, your space size and, if available, a rough layout. You’ll receive a suggested plan, materials list and a cost estimate — ready for internal approval.
By proceeding you agree with our practices described in the Privacy page.
